Project Overview
As part of the development works at the School, Rhoose Primary required additional space to temporarily accommodate their pupils.
Working in a live school with restricted access, Mid Glam Construction was able to carry out the groundworkâs package and install the buildings with minimal disruption.
Our design for the Linked Landings, Ramps and Steps between the Buildings allowed ease of access on a sloping site whilst minimising cost.
Work Scope
- Installation of 3 No. Modular Buildings during construction phase of additional permanent Classrooms
- Foundations, Drainage and Services
- The Design and Installation of Linked Landings, Ramps & Steps between Buildings, all in accordance with DDA requirements